|
All checks were successful
PR Check — Frontend / frontend (pull_request) Successful in 1m58s
- Guide and docs.gettingStarted / docs.dashboard keys (FR, EN): eight steps, the two visit steps in the quick-start list, "Got it", 3/8 and 7/7, a finished path finds them done. - ADR 0022: acknowledgeStep and initializeVisitSteps do not notify (§2), ACKNOWLEDGE among the local actions (§4), the one-time initialization admitted like rule D9 (§5). - architecture.md: eight rows, the amended "never by a click" invariant, the two new preferences, the provider's new action and initializer. - QA list: step numbers moved to eight, five cases for the visit steps. - CHANGELOG: Added entry in both files. Resolves #425 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| adr | ||
| archive | ||
| analyse-onboarding-2026-09.md | ||
| api-contract-prices.md | ||
| architecture.md | ||
| audit-bilan-2026-05.md | ||
| guide-utilisateur.md | ||
| qa-onboarding.html | ||
| qa-refonte-seed-categories-ipc.md | ||
| qa-update-cycle.md | ||